top of page

Bridge replacement to start in Tulsa

US-75 bridge replacement project at 81st St. begins Monday


OK Energy Today

May 28, 2026

A nearly $27 million bridge replacement project on US-75 at 81st St. in Tulsa begins Monday and drivers are being alerted to the more than year-long construction that could interfere with their traffic.

Drivers should expect narrowed lanes and a reduced speed limit through the work zone. Two lanes of traffic will be maintained in each direction on US-75 during peak travel times. The project will replace both north and southbound US-75 bridges over 81st St. with modern, wider structures. 81st St. will also be widened below the highway, and the interchange will be converted into a diverging diamond interchange, where 81st St. traffic will temporarily switch to the left side of the road between highway ramps, which increases safety and reduces congestion.


View the full article: OKEnergyToday.com

Recent Posts

See All
Traffic Signal Change Alert: I-44 & Gore Boulevard

City of Lawton Caitlin Gatlin May 27, 2026 Drivers should be aware of recent traffic signal changes at the Gore Boulevard intersections on both sides of I-44. Both intersections allowing vehicles to e

 
 
 
Trust-Logo-Orange.png

TRANSPORTATION REVENUES USED STRICTLY FOR TRANSPORTATION

CONTACT US

P.O. Box 16112

Oklahoma City, OK 73113

FIND US ON

Membership Director

Helra Han

helrahan@gmail.com

(405) 802-8184

MAILING ADDRESS

© 2026 Restore T.R.U.S.T. All Rights Reserved.
bottom of page